Prices of works in Baroque style company

Dear visitors. Prices of construction work of "Baroque Style" slightly above market due to the fact that our company:

a) shall be responsible for the quality and execution of the full scope of work;
b) we are working with expensive materials, the cost of which may at times exceed themselves work and materials. Not all builders can conduct preparatory work for general construction to ensure the longevity of expensive finishing materials, quality stacking them on the site;
a) To this end, we select employees without bad habits, teach them, including abroad;
g) In connection with the responsibility for the final result, we do not use the materials for general construction questionable quality, and only well-known manufacturers, we buy them ourselves from the manufacturer without any intermediary;
d) we will not substitute materials producers in other low-quality substitutes;
e) The standards we stand and guests, do not save on materials hidden in the works;
g) we pay payroll taxes builders since we don't have "hack workers." Their just not profitable to teach because of the unreliability of cooperation on a permanent basis;
h) We can get the best prices for materials because we not overprice manufacturers and dealers to earn the discount. This is enough for us;
i) Only we have the customer can reclaim the difference in work on general construction when ordering interior items at prices factories producing !!!!!This ensures the original receipt of the order not a fake, legal clearance, free consultation at purchase. And as an opportunity for an advance payment bank guarantee product and its original, and delivery to the customer !!!!

Num. Type of work measurement Price per unit, UAH.

Section 1. Disassembly.

1. Dismantling personal partitions m ² 25

2. Dismantling of ceiling drywall constructions. m ² 30

3. Dismantling brick partition walls in 1/2 bricks m ² 65

4. Breaking down ceramic tiles. m ². 16

5. Development screed (up to 100 mm) m ². 28

6. Dismantling plaster. m ². 25

7. Development of wooden floors. m ². 32

8. Dismantling of steel structures. t. 500

9. Removal of debris and loading. t. 160

10. Handling, lifting lift an object. t. 160

Section 2. The walls, partitions.

1. Masonry interior walls (thickness of 250 mm). m ³. 600

2. Masonry partition walls in 1/2 bricks. m ². 90

3. Plasterboard partitions. m ². 140

4. Patching walls with plasterboard on metal

frame with the laying of insulation. m ². 110

Section 3 floors

1. Primer of floor. m ². 12

2. Roll-waterproofing. m ². 65

3. The device of cement-sand screed

(thickness up to 75 mm.). m ². 85

4. The device ties of self-leveling compounds. m ². 55

5. Laying ceramic floor tiles. m ². 140

6. Device ceramic skirting. Lm. 50

7. Laying of floor mosaics. m ² from 360

8. Setting a floor mosaic panel. m ². 550

9. Laying carpet. m ². 50

10. Laying laminate. m ². 50

11. Laying of parquet, sanding, floor varnishing. m ². 200

12. Laying of granite or marble slabs m ². 180

Section 4. Ceilings

1. Installation of plasterboard-ceilings in one level. m ². 140

2. Installation of plasterboard ceilings in two levels. m ². 200

3. Mounting plasterboard ceilings in three levels. m ². 275

4. Installation of drywall ceilings radius. m ². 250

5. Installation of drywall ceilings with outdoor lighting. m ². 160

6. Installation of drywall ceiling beams. Liner meter. 120

Section 5. Finishing work (walls and ceilings)

1. Stuffing stucco galvanised mesh walls. m ². 30

2. Stuffing plaster ceilings galvanised grid. m. 50

3. High quality plaster walls complex solution. m ². 105

4. High quality plaster ceiling with cement mortar. m ². 200

5. Plaster walls (Rotband). m ². 75

6. Plaster walls plaster mixture (Knauf MP-75). m ². 90

7. To glue the outer and inner corners - metallokorn. Liner meter. 15

8. Preparation of walls (start, finish), sanding, priming. m ². 130

9. Preparations of ceilings (start, finish), sanding, priming. m ². 150

10. Sticking glass fiber wall. m ². 50

11. Sticking glass fiber ceiling. m ². 60

12. Decorating the walls with marble (granite) tiles. m ². 200

13. Laying ceramic tile walls. m 150

14. Laying mosaic on the wall m ². 365

15. Laying mosaic mural on the wall. m ². 570

16. Wallpapering the walls. m ². 65

17. Paint the walls with 2 layers of water-based paints. m ². 45

18. Stained ceilings in 2 coats latex paint. m ². 55

19. Device decorative textured plaster walls. m ². 150

In addition, the following types of work:

  • electrical work
  • low-current operation
  • plumbing services (water, sewage, heating, warm floors)
  • work on the installation of ventilation and air-conditioning
 
Detail Project
+38 097 295 7775ru
Заказать проект
^